NEWS

NEWS

IN THE NEWS

Core5 Industrial Partners announces 772,000-square-foot building in Elsmere, KY available Q3 2021

ELSMERE, KY — September 30, 2020 – Core5 Industrial Partners has closed on a 65-acre industrial site at Exit 180 in the Airport submarket of Kentucky. Core5 will immediately break ground on the development of C5 75/71 Northern KY Logistics Center, a 772,000-square-foot state-of-the-art logistics facility. Delivery of the building is scheduled for Q3 2021. The 772,000-square-foot cross-dock building, divisible to +/- 300,000 square feet, will feature 40-foot clear ceiling height and can accommodate trailer parking for up to 248 trailers and 330 auto parking spaces. The site is strategically located 2.5 miles from I-75/71 (exit 180), offering superior access to Cincinnati’s CVG International Airport, DHL’s Super Cargo Hub, and the future home of Amazon Prime Air. A 2-day drive reaches nearly 90% of the U.S. population. C5 75/71 Northern KY Logistics Center also benefits from an immediate strong labor market, exceptional transportation infrastructure, and a 30-year pilot tax abatement. “Core5 is bringing best-in-class ideas to the C5 75/71 Northern KY Logistics Center project,” states Doug Armbruster, Senior Vice President for Core5. “It will be a real game changer for the market. The access is exceptional. Coupled with 40’ clear height, low real estate taxes and strong labor pool, it’s an unbeatable location for users who need access to the interstate and the UPS cargo facilities,” added Armbruster. CBRE will represent Core5’s leasing efforts for the building. 
Read More

Core5 Industrial Partners Starts 1 Million-Square-Foot Bourbon Trail Logistics Center

LOUISVILLE — July 22, 2019 – Core5 Industrial Partners, a new-to-Louisville developer and owner of industrial properties, has started construction on the largest speculative building in the market, a 1,038,240-square-foot building at Bourbon Trail Logistics Center, located less than one mile from I-65 at KY-245 in Shepherdsville. The building is the first 40-foot clear height speculative building to deliver in the market and will be available in the second quarter of 2020. The million-square-foot building offers generous parking for 638 auto spaces with options to expand and 237 trailer storage locations. “Core5 is bringing the best-in-class ideas to the Bourbon Trail Logistics Center project,” states Doug Armbruster, Senior Vice President for Core5. “It will be a real game changer for the market. The access is exceptional. Coupled with 40’ clear height, low real estate taxes and strong labor pool, it’s an unbeatable location for users who need access to the interstate and the UPS cargo facilities,” added Armbruster. The Louisville International Airport houses UPS Worldport, the largest automated package handling facility in the world and the center point of UPS’s worldwide air network. The project is located less than one half mile from I-65 where a high concentration of commodities flow through Kentucky. JLL’s Powell Spears and Matt Hartlage represented Core5 in purchasing the 49.8-acre site and will also represent Core5’s leasing efforts for the building. “This project checks all the boxes for users seeking strategic logistics opportunities – location, infrastructure, strong labor talent, incentives and the latest in distribution space design,” states Spears. The project design team consists of MacGregor Associates Architects and Mindel Scott.
Read More
1 12 13 14 15 16 43

PRESS RELEASES

Core5 Industrial Partners Completes the first phase of DeSoto 55 Logistics Center and signs its first lease with DSV Solutions in greater Memphis market

ATLANTA, October 15, 2018 – Atlanta-based Core5 Industrial Partners announced today the completion of two inventory buildings in their first development in the greater Memphis Market, DeSoto 55 Logistics Center. DeSoto 55 Logistics Center is a 175-acre Class-A business park, located in Horn Lake, MS along the I-55 Corridor less than 10 miles to Memphis International Airport, and will encompass over 2.5 million square feet once fully developed.  The initial phase of the development was completed in October 2018 and included Building A1, a 581,475 SF cross-dock facility, which is expandable to over 1 million square feet and Building B, which is a 300,145 SF rear-load building.  In addition to the completion of the first two buildings, Core5 also signed a pre-lease of 200,000 SF in Building B to DSV Solutions.

(more…)
Read More
1 3 4 5 6 7 15